ADR-0021 Phase 1 results

2026-10-06. gate-api, prod/staging, one real release (1.1.2-5d5c8fc, release id 89608529-26f1-429e-b2f0-f93bce2aa2f3:prod/staging). Relay in FACTS_MODE=shadow, hook Jobs still live, so both paths reported the same release.

Exit criterion: met

The phase 1 check was that both paths emit equal CDEvents for one real release. Normalized (id, timestamp and finishedAt dropped), the fact path’s events were identical to the hook path’s:

Event Hook path Fact path Identical
environment.deploying (Syncing) 1 at 00:57:15 8 at 00:57:29 to 00:59:49 yes, all 8
environment.deployed (Succeeded, success) 1 at 00:59:56 1 at 00:59:49 yes

The 8 deploying facts are the Rollout re-reporting Progressing after each pause step and the heartbeat. They carry one deterministic id, so downstream they collapse to one PipelineRun, which is the idempotency design working. A deploying fact also arrived in the same second as the deployed one (00:59:49): a reducer must ignore a Progressing after the release is terminal. Phase 2 does.

What the real release showed

  • The chain works end to end. open-release-pr wrote the full release record on dev and releaseTracking.releaseId into release.yaml; airframe v0.3.117 rendered hangar.io/release-id and the release-tracked label on the Rollout; the Rollouts engine on prod posted facts to the dev relay through the merged ExternalSecret token; the relay joined them to the record and rebuilt the events. No errors in the Rollouts controller or the relay.
  • The Rollout stayed Synced in Argo CD with 11 notified... keys on it, as in phase 0.
  • Hook cost, measured. The Argo operation ran 00:57:01 to 01:00:00. PreSync ran 00:57:07 to 00:57:18 (11 s before the Rollout was touched) and PostSync 00:59:50 to 00:59:59 (the operation closed 11 s after the Rollout was Healthy at 00:59:49). The fact path reported success 7 s before the hook did, and the operation sat Running while the Rollout was Paused, which is the hold ADR-0021 removes.
  • The deploying fact is later than the hook’s (00:57:29 against 00:57:15) because it is sent when the Rollout starts progressing, after PreSync and apply, not when the sync starts. Lead-time and “time to start deploying” figures will shift by that gap when the hooks go.

Not yet verified

  • A scale or self-heal produces no new event id on a live Rollout. Covered by the relay’s unit tests and by phase 0 on dev; not repeated on gate-api.
  • A failed or aborted release through the relay. Covered by the same.
  • The prune CronJob’s first scheduled run (17 */6 * * *, first at 06:17 UTC).

Next

Phase 2: the retained ReleaseRecord and reducer state machine (ignore a late Progressing after a terminal state, stall alert, drift fact), then cut the five apps over (phase 3) and rename the relay. The Argo CD sync-failed trigger is not installed on prod yet; it belongs with phase 2 (decision 4 of the ADR, with the finishedAt and retry notes from phase 0).