ADR-0021 Phase 1 results
2026-10-06. gate-api, prod/staging, one real release (1.1.2-5d5c8fc, release id
89608529-26f1-429e-b2f0-f93bce2aa2f3:prod/staging). Relay in FACTS_MODE=shadow,
hook Jobs still live, so both paths reported the same release.
Exit criterion: met
The phase 1 check was that both paths emit equal CDEvents for one real release. Normalized
(id, timestamp and finishedAt dropped), the fact path’s events were identical to the
hook path’s:
| Event | Hook path | Fact path | Identical |
|---|---|---|---|
environment.deploying (Syncing) |
1 at 00:57:15 | 8 at 00:57:29 to 00:59:49 | yes, all 8 |
environment.deployed (Succeeded, success) |
1 at 00:59:56 | 1 at 00:59:49 | yes |
The 8 deploying facts are the Rollout re-reporting Progressing after each pause step and
the heartbeat. They carry one deterministic id, so downstream they collapse to one
PipelineRun, which is the idempotency design working. A deploying fact also arrived in the
same second as the deployed one (00:59:49): a reducer must ignore a Progressing after the
release is terminal. Phase 2 does.
What the real release showed
- The chain works end to end.
open-release-prwrote the full release record on dev andreleaseTracking.releaseIdintorelease.yaml; airframe v0.3.117 renderedhangar.io/release-idand therelease-trackedlabel on the Rollout; the Rollouts engine on prod posted facts to the dev relay through the merged ExternalSecret token; the relay joined them to the record and rebuilt the events. No errors in the Rollouts controller or the relay. - The Rollout stayed
Syncedin Argo CD with 11notified...keys on it, as in phase 0. - Hook cost, measured. The Argo operation ran 00:57:01 to 01:00:00. PreSync ran
00:57:07 to 00:57:18 (11 s before the Rollout was touched) and PostSync 00:59:50 to
00:59:59 (the operation closed 11 s after the Rollout was Healthy at 00:59:49). The fact
path reported success 7 s before the hook did, and the operation sat
Runningwhile the Rollout wasPaused, which is the hold ADR-0021 removes. - The deploying fact is later than the hook’s (00:57:29 against 00:57:15) because it is sent when the Rollout starts progressing, after PreSync and apply, not when the sync starts. Lead-time and “time to start deploying” figures will shift by that gap when the hooks go.
Not yet verified
- A scale or self-heal produces no new event id on a live Rollout. Covered by the relay’s unit tests and by phase 0 on dev; not repeated on gate-api.
- A failed or aborted release through the relay. Covered by the same.
- The prune CronJob’s first scheduled run (
17 */6 * * *, first at 06:17 UTC).
Next
Phase 2: the retained ReleaseRecord and reducer state machine (ignore a late Progressing
after a terminal state, stall alert, drift fact), then cut the five apps over (phase 3) and
rename the relay. The Argo CD sync-failed trigger is not installed on prod yet; it
belongs with phase 2 (decision 4 of the ADR, with the finishedAt and retry notes from phase 0).